The construction of the Ballarat and Geelong corridors included the placement of 110km (Ballarat) and 40km (Geelong) of control points.
This involved the levelling and co-ordination of control points every 200 metres for the entire corridor length.
The construction of new rail bridges, culvert plus track laying of approximately 200km of new rail & ballast.